Animation of a Telecommunications Site Example Layout
The animation below provides an example of a telecommunications site layout that uses hydrogen fuel cells for backup power along with some of the codes and standards that apply to such a site. Roll over each of the colored bars below to reveal individual setback requirements, which identify the mandatory separation distances of the site's various components, or select the "Go to Setback Details" button for a chart that summarizes these requirements as defined by the 2006 International Fire Code. Select the "Construction Approval" button for a detailed list of codes and standards related to the construction of a site, or select the "Operation Approval" button for codes and standards related to ongoing operation and maintenance.
View the text version of this animation.
Although the setback information in this animation is based on 2006 International Fire Code requirements, other federal, state, and local requirements may apply. Learn more about using fuel cells for backup power for telecommunications facilities.

